Water Resources - Business Infomation
-
In relation to water regulation and flood control works, Water Resources & Water Environment department is in charge of the entire process for close-to Nature River project from assessment, planning to design phases by accomplishing the ecological restoration of the river and environmental improvements.
Also, we have established the flood control methods of utilizing and conserving overall water resources, preventing flood damage and taking measures in flood prone areas for bringing stability to people’s live and the nation’s economy.
We provide the optimal and rational designs of hydraulic structures by securing waterfront and establishing methods for water quality improvement and water volume based on water demand forecasting.
-
Main Work AreaBasic planning and management system for river & streamBasic and detailed design of ecological stream restorationMaster planning of storm and flood damage reductionMaster planning for small river improvementBasic and detailed design of rainwater detention facility constructionAnalysis of disaster effects and countermeasureDetailed design of river environment improvement worksComprehensive development plan of water resources and basin surveyImprovement of disaster risk areas
-
Small river(Yonggang river) improvement work
- Detailed design for flood control stability of river
- L=1,460m
Detailed design for hydrometric station- Design of hydrometric station utilized for flood forecasting and hydrological investigation
- Optimal design of hydrometric station considering economic efficiently, constructability and aesthetics
Detailed design for river environment improvement work in Nam River San Cheong area- Increase of flood control stability, development of river place for ecology, culture and leisure activities
- L= 6.6km
Detailed design for river improvement project at downstream of Gunwi dam- Flood damage reduction and remove of dam operational constraints by river improvement Project
- L=17.4km
Detailed design for rehabilitation of drainage and irrigation system- Supply of agricultural water by existing facilities rehabilitation
- L=6.8km, Area=50.7ha
Master plan for small river improvement in Hongcheon gun- River improvement, inventory of small river and river management information system
- Small river: 67 locations, L= 164.997km
Management plan for water reuse in Taebeak city- Measures for water shortage, sustainable water resources development and management
- Project area: 303.57㎢
Detailed Design for preventing disasters in Jupo river- flood control of river and environment improvement
- Embankment : 1,0000m, bridges : 4 nos., Weir: 4 nos.
- Water Resources 1
- Water Resources 2
- Spring
- Summer
- Autumn
- Winter
-
Natural Disaster Assessment
Disaster Assessment team is in charge of estimating and analyzing the factors causing the digesters affecting the natural digester due to administrative plans and development projects.
Moreover, we have proposed the optimal solution for preventing and mitigating damages from storm and flood by establishing the comprehensive measures, conducting the assessment of disaster restoration works and coping with emergency or urgent situation such as dam and reservoir failures.Pre-disaster impact assessment of Hamyeol cultural park construction- Location : Wari, Hamyeolup, Iksan si
- Project Year: 2012, Work Scope: 34,750 m²
Pre-disaster impact assessment of traffic improvement project in Ulsan Songjeong district- Location: Hwabong-dong and Songjeong-dong, Buk-gu, Ulsan metropolitan city
- Project Year: 2013~2014, Work Scope: 1,438,059 m²
Pre-disaster impact assessment of East Coast Free Economic Zones development- Location: East Coast Gangwon-do(Gangneung City and Donghae City)
- Project year: 2012~2013, Work scope: 8.25 km²
Pre-disaster impact assessment of pavement and widening of provincial road No.408- Location: Myeonon-ri~Mui-ri, Bongpyeong-Myeon Pyeongchang-gun, Gangwon-do
- Project year: 2013, Work scope: 5.485km
Analysis and assessment of disaster restoration in Chuncheon city- Economic and effectiveness analysis on disaster restoration project
- Restoration construction of 386 flood damaged facilities in Sep. 2011
Pre-disaster impact assessment of environmental improvement project of national road No.59- Location: Samsan-ri, Yeongok-myeon, Gangneung-si ~ Eoseongjeon-ri,Hyeonbuk-myeon,Yangyang-gun,Gangwon-do
- Project year: 2015, Work scope: 7.5km
- Fuzhou
- Natural Disaster Assessment
- Natural Disaster Assessment
- ras
- in Chuncheon city
- Simulation