Railway - Business Infomation
-
The railway industry, which will lead the 21 Century green-growth traffic trend across the world, will create a new future value and enhance the quality of life for many people across the world through stable, punctual, and energy-efficient traffic services.
Railway department of ILSHIN E&C has participated in major national railway projects including the Gyeongbu and Honam High-speed Railway, contributing a lot to the balanced national development. In this ‘Railway Renaissance Era’, we try to grow into a globally competitive industrial leader by actively developing railway technologies and human resources based on our accumulated technical prowess in order to realize a safe and environment-friendly railway operation.
-
Main Work AreaPre feasibility study, feasibility study, basic plan, preliminary & Detailed DesignPreliminary/detailed design of stations, train depot, track and road-bedLayout design of station and train depot for railway construction and improvementAlternative Design, Turn-key Design, PPPResponsible Supervision of Railway Track and Road-bedSupport of design supervision supplementation of design drawing and structure review
-
High-speed Railway
Detailed Design (Road-bed) of Honam High-speed Railway Section No.1- Length : 22.10km
- Earthwork : 2.62km
- Tunnel : 15.91km
- Bridge : 3.57km
Detailed Design (Road-bed) of Honam High-speed Railway Section 2-3- Length : 9.60km
- Tunnel : 0.29km
- Bridge : 9.31km
Detailed Design (Road-bed) of Gyeongbu High-speed Railway Section 13- Length : 29.80km
- Tunnel : 19.65km
- Bridge : 4.19km
Detailed Design (Road-bed) of Gyeongbu High-speed Railway Section No. 6-4A- Length : 4.53km
- Earthwork : 0.30km
- Tunnel : 4.50km
- High-speed Railway
- Gyeongbu High-speed Railway
-
Regional Railway
Detailed Design (Road-bed) of Wonju-Ganneung railway (Section 7)- Length : 11.50km
- Earthwork : 3.31km
- Tunnel : 7.51km
- Bridge : 0.68km
- Station : 1 no
Consultancy Services for Construction Supervision of Janghang line (Improvement Phase 2, Section 2)- Total Length : 14.305km
- ridge: 1.839km
- Tunnel : 7.169km
- station 1 no.
Consultancy Services for Preliminary and Detailed Engineering Design of Janghang line (Improvement Phase 2, Section 2)- Total Length : 8.600km
- Earthwork: 5.338km
- Bridge : 3.262km
Consultancy Services for Detailed Engineering Design of Bonsung~Imsungri railway (Section 5)- Total Length : 12.549km
- Bridge : 0.880km
- Tunnel: 7.923km
- Station 1 no.
Consultancy Services for Detailed Engineering Design of Icheon~Chungju railway (Section 1)- Total Length : 10.000km
- Bridge : 2.555km
- Tunnel: 0.930km
- station 1 no.
Consultancy Services for Detailed Engineering Design of Jungbu Naeruk line Icheon~Mungyeong (Section 9)- Total Length : 7.150km
- Bridge : 1.450km
- Tunnel: 2.715km
- Station 1 no.
- Wonju-Ganneung railway 1
- Wonju-Ganneung railway 2
-
Subway
Detailed Design of Bundang Double-track Subway Wangshipri~Seonreung Line- Length : 6.80km
- Station : 1 no.
Alternative Design of Daegu Metropolitan Transit Line No. 3 (Palgeocheon)- Length : 2.95km
- Station : 4 nos.
- DBundang Double-track Subway Wangshipri~Seonreung Line
- Daegu Metropolitan Transit Line No. 3
-
Orbital Design
Consultancy Services for Detailed Engineering Design of Track of railway construction of Poseung~Pyeongtaek (Section 2)- Track Construction : 10.700km
Consultancy Services for Detailed Engineering Design of Track of railway Construction of Icheon~Mungyeong- Track Construction : 59.868km
Consultancy Services for Detailed Engineering Design of track of exclusive line for railway vehicles of Noryeong Station of Honam Line- Track Construction : 1.683km