Road / Highway - Business Infomation
-
Road and Airport department of ILSHIN E&C, equipped with sophisticated technical expertise, creative consulting services, and excellent human resources, has participated in diverse domestic projects (including PPP, Turn-key, alternative design), contributing a lot to the national road and airport industrial development.
More recently, it is actively adopting the latest technologies through new consulting solutions, work methods and R&D performances in order to further advance into overseas markets mainly in Southeast Asia, Central Asia, and Africa.
-
Main Work AreaPre-feasibility study, feasibility study, preliminary designDetailed design of expressway, national highway, and provincial roadsAlternative design, turn-key design, public-private-partnership projectsDevelopment and application of new technology, new methods, and patentDevelopment and application of road design computer programs
-
Road / Highway
Consultancy Services for Detailed Engineering Design for improvement between Hamyang-Ulsan with 4 other lanes- Total Length: L=34.88km (5~8 lanes)
- Bridge: 23 nos.
- Toll gate 3 nos., Interchange 19 nos.
Consultancy Services for Preliminary and Detailed Engineering Design for Expressway construction of Sejong-Ansung (Section 2)- Total Length: L=12.95km (4 lanes)
- Bridge: 12 nos. / Tunnel: 4 nos.
- Rest Area 1 no. : Yeongi rest area
- Toll gate 1 no. : Osong Toll gate
Consultancy Services for Detailed Engineering Design of Trunk road construction of Waryong~Beopjeon- Total Length: L=5.3km (2 lanes)
- Bridge : 6 nos. / Tunnel : 4 nos.
- At grade intersection 3 nos., Roundabout 1 no.
Consultancy Services for Preliminary and Detailed Engineering Design for Rehabilitation of Cheongdo~Milyang (Section 1)- Cheongdo~Milyang 1 : L=7.03km (2 lanes) / Samryangjin-Mijeon : L=1.76km (4 lanes)
- Bridge: 2 nos. / At grade intersection: 17 nos.
Consultancy Services for Preliminary Design of Trunk road construction of Imsil-Jangsu- Total Length: L=21.9km (2 lanes)
- Bridge: 12 nos. / Tunnel: 4 nos.
- At grade intersection : 17 nos., Roundabout: 3 nos.
Consultancy Services for Preliminary and Detailed Engineering Design for Trunk road construction of Uiryeong~Hapcheon- Total Length: L=9.12km (2 lanes)
- Bridge : 1 no.
- At grade intersection: 11 nos., Roundabout: 3 nos.
Consultancy Services for Preliminary and Detailed Engineering Design of Trunk road construction Donggye~Jeoksung- Total Length: L=4.8km (2 lanes)
- Bridge: 2 nos. / At grade intersection: 6 nos.
Consultancy Services for preliminary and Detailed Engineering Design of Gyeryong-si beltway construction of Yeonsan-Duma (Section 1)- Total Length: L=4.4km (4 lanes)
- Bridge: 4 nos. / Tunnel: 1 nos.
- Interchange: 1 no.